To set up a manufacturing facility to produce Water Electrolysis System with a capacity of 3GW per annuum to serve the local and regional demand.
Sector
Energy
Download Opportunity
Investment Highlights
- Expected Investment size of USD 210 M
- Plant capacity: 3 GW*
- Expected IRR: 15%
- Payback period: 5-6 Years
- Job Creation: 797
- GDP Impact %: 0.24% by 2036