Setting up a manufacturing and assembly plant for the production of power transformers (above 100MVA) in KSA
Sector
Energy
Investment Highlights
- Investment size of USD 13-40 Mn
- Opportunity to consider different operating models – pure private sector model or joint venture with local player
- Expected timeline to set up the manufacturing and assembly plant is 3-4 months
- Estimated cumulative transmission HV substations capacity target (KSA – 214K MVA, MEA – 664K MVA) over 10 years
- Expected IRR – 17%