Setting up a manufacturing and assembly plant for the production of high voltage gas insulated switchgear (HV& EHV GIS) in KSA.
Sector
Energy
Investment Highlights
- Expected investment size of USD 13-40 Mn.
- Opportunity to consider different operating models – pure private sector model or joint venture with local player.
- Expected timeline to setup the manufacturing and assembly plant is 3-4 months.
- Estimated cumulative transmission HV substations capacity target (KSA – 214K MVA) over 10 years.