Setting up a manufacturing and assembly plant to produce Insulator Post and Insulator Suspension in KSA
Sector
Energy
Download Opportunity
Investment Highlights
- Expected investment size of USD 5-15 Mn
- Expected IRR: 9%
- Opportunity to consider different operating models – pure private sector model or joint venture with local player
- Expected timeline to setup the manufacturing and assembly plant is 3-4 months
- Estimated cumulative distribution HV (High Voltage) substations capacity target (KSA – 188K MVA) and cumulative transmission substations capacity target (KSA – 214K over 10 years