Develop and operate an engineered landfill to dispose municipal waste generated in the Royal Commission at Yanbu.
القطاع
الخدمات البيئية
تحميل الفرصة
أبرز معالم الاستثمار
- Location (Region): Royal Commission at Yanbu
- The total capacity expected: 200 KTon/Year
- Investment Size: 130M – 150M SAR
- Expected IRR: 20-25%
- Land Size: 283.66 Ha