Electrical Cutout Fuse

Setting up a manufacturing and assembly plant for the production of Cutout Fuse (15.2 Kv, 36 Kv) 100 A in KSA.

القطاع

الطاقة
تحميل الفرصة

Thank you for your interest in the Invest Saudi.

تم استلام طلبكم، وسنتواصل معكم في أقرب وقت ممكن.

أبرز معالم الاستثمار

  • Expected investment size of USD 5-15 Mn
  • Opportunity to consider different operating models pure private sector model or joint venture with local player
  • Expected timeline to setup the manufacturing and assembly plant is 3-4 months
  • Estimated distribution HV substations capacity target (KSA – 188K MVA) over 10 years 

المزيد من الطاقة الفرص